1000kW Coal Gas Generator Set
Large flow and high boost intake systems can adapt to wide concentration variations (8-60% methane concentration)
CNPC Ji Chai Gas (coal bed methane) power generation products were first used in Jincheng area in 2003. Since 2005, the company has increased r&d investment in coal mine gas power generation products, paid attention to communication and cooperation with relevant research institutes of coal mines, and established close ties with China Coal Bed Methane Society, Henan University of Science and Technology, Fushun Coal Branch General Institute and other coal design institutes. Have research and development of coal mine gas proprietary models 8 kinds of high and low concentrations of power to cover 200-1500 kw, adopting advanced gas machine control technology in the world, and the thin combustion theory, in view of the domestic gas drainage discharge process, the characteristics of the volatile gas concentration, through the reasonable matching of air intake system, makes the gas unit to adapt to the performance of the more broad, can burn methane concentration from 8% to 60%, in the range of 3 to 15 kpa pressure of gas, its performance, fuel economy, safety and reliability have reached the international advanced level.It is distributed in 13 major coal producing areas, and more than 500 sets of gas (CBM) equipment have been sold in Shanxi market alone.
Engine Series | 190 high contration gas engine(550-1200KW) |
Engine Model | H16V190ZLW-2 mass gas engine |
Cylinders & Arrangement | 16 cylinders V type |
Cylinder bore,mm | 190 |
Piston Bore,mm | 215 |
Rated Power,kW | 1200 |
RPM,r/min | 1000 |
Total Piston Displacement ,L | 97.53 |
Heat consumption rate kJ/kW.h | ≤9500 |
Lub. oil consumption rated g/kW.h | ≤0.6 |
Staring Mode | Electrical starting/Air Starting |
Pre-sales
Develop detailed equipment configuration scheme to meet customer requirements, and help customers improve the technical scheme of the entire power consumption scenario.
In sale
Guide the installation, commissioning and acceptance of power generation equipment; Responsible for the placement and installation of power distribution and control system equipment; Free technical training (operation, maintenance) for user operation and maintenance personnel.
After sale
All-weather duty, within 2 hours after receiving the service information to give an effective reply, if the need for service personnel to the crew site for troubleshooting, within 48 hours to the scene
Packaging and delivery
1. International general fumigation-free wooden box, bulk cargo, container, standard export packing.
2. Select the most cost-effective means of transport according to the number of goods packing boxes to ensure that the goods reach the customer's location safely.
Related Products
Submitted successfully
We will contact you as soon as possible
Related News
Submitted successfully
We will contact you as soon as possible