Gas Air Compressor-manufacture,factory,supplier from China

(Total 24 Products for Gas Air Compressor)
It can be used in gas injection, gas drilling, pipeline pressure testing and other fields.Gas inlet pressure1.0~2.4MPaGGas OUTlet pressure17~50MPaGas displacement 25~100Nm3/minWork Mode24 continous working modeAfter-sales service1. You can communicate directly with us through email, social media, online websites, etc.;2. You can visit the factory to determine the most suitable products for you;3.
  Contact Now
Engine and compressor share one frame and one crankshaft,subject to symmetrically balanced arrangement,so that inertia force and inertia moment can be well balanced and vibration is small;Internal mixing gas injection and loop scavenging can effectively cool and clean cylinders,thereby ensuring that fuel can be controlled and saved;lsolated room of compressed air between compressor frame and engine piston can effectively prevent combustion exhaust from releasing to oil sump,prevent pollutions by lubricating oil and extend the service life;Power cylinder has a simple structure,wi
  Contact Now
L20V1902LT-2 type closed-loop electrically controlled external mixing natural gas machine features:1、Turbocharger pre-mixing technology, where gas and air are sucked in at the same time in the compressor, to be suitable for low pressure gas,2,Rarefied combustion technology,WOODWARD's E6 control system is used to control the air-fuel ratio accurately to reach the high - altitude combustion ratio, rarefied combustion3,The single point injection and air - fuel ratio closed - loop control technology can realize the closed - loop control of air - fuel ratio (in).The engine can adjust the amount
  Contact Now
Accessories Policy:Quality and customer first, excellent service and quality based on the guarantee of parts life.Warranty: The warranty period of the compressor unit is 8,000 hours from the date of first operation after the completion of the installation acceptance test; Or within 1 year from the date of delivery (whichever comes first).
  Contact Now
Working mediumNatural gas, coal bed gas, shale gas, oil field associated gas, flash vapor, air, nitrogen, carbon dioxide, hydrogen, nitrogen hydrogen and so on.Spare parts supplyAccording to the loss of supporting parts, such as connecting rod, cross head, compression cylinder, distance plate, power piston, piston rod, power cylinder head, compression piston, compression piston rod, bearing bush, connecting rod bearing bush, copper bearing bush, cross head pin, air valve assembly, etc., the company has established a compressor spare parts library, which covers all kinds of parts and has suffic
  Contact Now
One of the direct consequences of the blockage of the supercharger channel is to increase the resistance of the airflow in the system. When the engine is running, the gas flow route of the pressurization system is: compressor inlet filter and muffler → compressor impeller → compressor diffuser → air cooler → scavenging box → diesel engine intake port (valve) → exhaust port (valve) → exhaust pipe → exhaust turbine nozzle ring → exhaust turbine impeller → chimney. The circulation area of each component is fixed.
  Contact Now
Turbocharger pre-mixing technology, where gas and air are sucked in at the same time in the compressor, to be suitable for low pressure gas.Rarefied combustion technology, WOODWARD's E6 control system is used to control the air-fuel ratio accurately to reach the high - altitude combustion ratio, rarefied combustion.The single point injection and air - fuel ratio closed - loop control technology can realize the closed - loop control of air - fuel ratio (in).The engine can adjust the amount of air and natural gas according to the requirements of different working conditions and different spe
  Contact Now
Advanced genst management module (IG-NT automatic synchronization and automatic load distribution)Online maintenance technology (continuous trouble-free operation time more than 2500 hours)Digital monitoring technology (full monitoring of engine thermal parameters and unit electrical parameters)Distributed energy system (electric-thermal system, electric-hot-cold system)International mainstream control technology (EGS Engine Intelligent Management System)International advanced air-fuel ratio control technology (TECJET air-fuel ratio automatic regulation)Large flow and high pressure intake syst
  Contact Now
Technical Characteristics
1,Designed and manufactured as per API613 and ISO13631.;
2,Horizontally and symmetrically balanced sructure,with an accurate weight diference in reciprocating parts in each row,can effectively balance the inertia force and inetia moment,so that the compressor unit can operate with a small vibration and a low noise;
3.Highly stiff bare compressor mectanism optimized via mechanical treatment can eliminate wall surface vertical to force drection,so that the bearing capacity can be increased;
4.Bearing surtace of transmlsslon part is suoject to a low tpecific pressure val
  Contact Now
 L20V1902LT-2type closed-loop electrically controlled external mixing natural gas machine features:1、Turbocharger pre-mixing technology, where gas and air are sucked in at the same time in the compressor, to be suitable for low pressure gas,2,The rarefied combustion technology uses WOODWARD's E6 control system to accurately control the air-fuel ratio.Reach the high - altitude combustion ratio, achieve rarefied combustion3,The single point injection and air - fuel ratio closed - loop control technology can realize the closed - loop control of air - fuel ratio (in).The engine can adjust
  Contact Now
This series of products adopts the most advanced automatic air-fuel ratio control technology; Its technical indicators in the engine performance, fuel economy, reliability and safety and other aspects of similar products have been greatly improved, the comprehensive performance indicators have reached the international advanced level, can be used with gas generating units and compressor units, but also to meet the needs of the city and well site power supply and compressor market.Product feature:Impartial mental property rightsInternational mainstream Control Technology (EGS Engine I
  Contact Now
Product feature:100%  intellectual property of companyInternational Control Technology (EGS Engine Management System))International mainstream air-fuel ratio control technology (TECJET air-fuel ratio automatic regulation management system)Large flow and high pressure intake automatic management system of adapting to a wide range of concentration changesLow pressure intake and rarefied gas combustion control technology (suitable for low pressure gas, lower emission)Engine seriesEngine modelEngine modelH16V190ZLT-1 gas engineCylinders & Arrangement16 cylinders V typeCylin
  Contact Now
100% independent intellectual property rightsInternational mainstream Control Technology (EGS Engine Intelligent Management System))International advanced air-fuel ratio control technology (TECJET air-fuel ratio automatic regulation)Large flow and high pressure intake system can adapt to a wide range of concentration changesLow pressure intake and rarefied combustion control technology (suitable for low pressure gas, better emission)Advanced genset management module (IG-NT automatic synchronization and automatic load distribution)Online maintenance technology (continuous trouble-free operation
  Contact Now
Technical advantage1、Internal mixing gas injection and loop scavenging can effectively cool and clean cylinders,thereby ensuring that fuel can be controlledand saved;2、Isolated room of compressed air between compressor frame and engine piston can effectively prevent combustion exhaust fromreleasing to oil sump,prevent pollutions by lubricating oil and extend the service life;3、Power cylinder has a simple structure,without such wearing parts as rocker arm,tappet rod,cam,timing mechanism etc.,and with lessquick-wear parts and maintenance works;4、The special sulfur resistant design and manufactur
  Contact Now
Product descriptionLandfill gas engine generators are well-established products in our product line. After years of painstaking research, the product incorporates the rich profit-making experience of the 12V190 gas engine, and the automation function of the unit is significantly enhanced. Reliable air-fuel ratio automatic control technology enables the unit to have higher gas applicability, stronger comprehensive performance and economy, and successfully reduces the emission index to the minimum.
  Contact Now
International mainstream engine management and control technology;International advanced air-fuel ratio control technology, tens of thousands of system matching, adapt to a variety of concentrations of CH4 gas;Equipped with large flow and high pressure air intake system, can adapt to a wide range of short-term concentration changes;Thin combustion in cylinder technology, fuel thermal efficiency is higher;Advanced generator multi-unit management module, support grid parallel and other unit group operation;The online maintenance system ensures the continuous operation of the unit for more than 2
  Contact Now
In order to meet the market demand of long-distance pipeline compressor drive power, offshore drilling platform power, large gas power station, distributed energy and other market demand, 3MW natural gas engine came into being, the product adopts 26/32 series gas engine, with independent intellectual property rights.
  Contact Now
The series of products in the engine performance, fuel economy, reliability and safety have been greatly improved, its main performance indicators have reached the international advanced level, the series of products can be used with compressor units and gas generator sets, to meet the needs of urban blocks and drilling sites power supply and compressor market.
  Contact Now
Product features: 100% intellectual property of companyInternational common Control Technology International advanced air-fuel ratio control technology Large flow and high pressure control system can adapt to a wide range of concentration changesLow pressure intake and rarefied combustion control technology      Advanced set management moduleOnline maintenance technologyDigital monitoring technology Distributed power system Engine modelG12V190ZLDT-2 gas engineCylinders & Arrangement12 cylinders V typeCylinder B
  Contact Now
High pressure steel wire braided hose operating temperature: oil -40℃ ~ 100℃, air -30℃ ~ 50℃, water emulsion +80℃ below.High pressure steel wire braided hose specification range: DN5mm ~ DN102mm.
  Contact Now
140 series engine is applicable to oil truck-mounted drilling rigs, mobile power stations, emergency power supply, engineering machines and trucks. The engine performance parameters reached advanced international standards.Engine code 140Pre-mixing before turbochargeAir and gas mixed before compressor, low requirement for gas inlet pressure.Air and gas mixed in long pipe, well mixedDigital ignition controlle
  Contact Now
Precise control (INTERNATIONAL: 2.1-2.3, Aid: 2.05) to achieve rarefied combustion;High efficiency (international: 42-45%; current test thermal efficiency: 44%), safety (explosion-proof devices, double-wall gas pipe and oil mist detector are installed in each system);High pressure, strong MILLER and low emissions;Detonation control technology and detonation pressure monitoring (or cylinder combustion temperature);Port Injection engine management system;Optimization control of air intake and air intake time between the main combustion chamber and the pre-combustion chamber;Load balance (correct
  Contact Now
The efficiency of its air exchange is higher than that of the natural intake of the general engine. When the air enters the turbocharger, its temperature will rise significantly, and the density will become smaller accordingly. The intercooler plays the role of cooling the air, and the high-temperature air is cooled by the intercooler and then enters the engine. If the lack of an intercooler and let the pressurized high temperature air directly into the engine, it will cause the engine to knock or even damage the flame.
  Contact Now
CNPC Chai Gas (coal mattress methane) electricity technology merchandise had beenfirst used in Jincheng region in 2003.
  Contact Now
Relate News
On November 22, the lunar light snow solar term, in the Weiyuan shale gas operation area site located in Qunjian village, Weiyuan Town, Weiyuan County, Neijiang City, Sichuan Province, the company's operation and maintenance personnel are inspecting day and night to ensure the steady and orderly operation of the compressor unit in use.Their all-weather "guard" of these "big country heavy equipment", the cumulative gas production this winter and next spring is expected to exceed 2.3 billion cubic meters.
Five 2000GF10-T Natural Gas Generator Sets  Delivering
We recently delivered 19 natural gas generators with horizontal radiators to Nigeria. These generators are designed to provide reliable, efficient power generation for a variety of applications including industrial, commercial and residential.Horizontal radiators are designed to provide superior performance in terms of cooling efficiency, durability and ease of maintenance.It ensures long-lasting performance and durability.
In June, 14 units of 1,000 kW natural gas generating units were delivered to Nigeria. Our natural gas engine generators are specially designed for low-pressure natural gas and feature high intelligence, low heat consumption, high reliability, low emissions, long life and high power.Our gas engine generator sets are ideally suited to power oilfield projects in Africa, providing a reliable, sustainable source of electricity. With our high-performance gas generator sets, customers can expect the best in power generation technology to ensure their business runs smoothly and without disruption.
In order to meet the needs of customers, our factory has accelerated the production schedule to ensure the delivery of natural gas engine generators on time. In October 2022, our factory sent 10 sets of 500 kilowatts natural gas engine generators to Qingdao Port for shipment to Nigeria. Up to now, there are 35 power plants in Nigeria, including 25 700kW natural gas generators and 10 500kW gas engine generators.Natural gas power stations continue to be built in Nigeria, contributing to the development of the African power industry.
On November 12, the company's first natural gas differential pressure generator set applied to the "first station of West-East Gas transmission" in Tarim Oilfield completed 72-hour trial operation and was officially put into use."Designed to generate more than 5 million KWH of electricity per year, it can reduce carbon emissions by more than 5,000 tons." The company's on-site staff Qi Junyong said that the power generated by the unit will all be transported to the high-voltage power distribution room of the station, providing electricity for the surrounding oil and
On December 7, news came from Shaopu Town, Zhijin County, Bijie City, Guizhou Province, that the first Jichai 20V190 gas generator set applied to the "Fetian 21 gas power station" in the region, the operation time exceeded 5,000 hours, and the cumulative power generation exceeded 7 million KWH, marking the first Jichai 1500 kW low-concentration gas power generation products to enter the local market.
Nigerian customers have ordered more than 30 600KW generator sets for the first and second phases of the project. The Phase III power station has two 11kV high-voltage generator sets and six 400V low-voltage generator sets. On September 15th, we successfully completed the delivery.
The company sent personnel to Russia to discuss cooperation mattersJust after the Spring Festival, at the invitation of the Russian side, the main person in charge of the company led the team to Russia for spring talks, conducted extensive exchanges on the market demand of the Russian side and the problems in the operation of the natural gas generator set, and visited a number of sites.
On December 1, the news came from Huilai County, Jieyang, Guangdong Province, that three 6,000 horsepower tugs with Jichai 270 high-power Marine engines as the main power completed more than 80 voyages of oil cargo ship docking and towing operations stably in Guangdong petrochemical, refining and chemical integration project, and product reliability and service quality were fully affirmed by users. Jichai products rely on surging power to boost the Guangdong petrochemical project sprint "put into operation in the year and create efficiency" work goal.